Decide Fast & Get 50% Flat Discount on This SPECIAL OFFER | Limited Time Offer - Ends In COUPON CODE: SAVE50%

Practice Exin CDCS Exam Questions

    1. Page: 1/12
      Total 60 Questions
    Question No 1
    Management has requested a 15 - minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS • Rated power 30 kVA • Rectifier input voltage 400 V/3 phase • Rectifier input power factor 0.8 • Battery rated voltage 384 V • Number of cells 192 • End of discharge voltage 308 V • Inverter output voltage 400 V/3 phase • Inverter output power factor 0.8 What information is missing to perform the battery calculation?
    Choose the Choices:


    Question No 2
    The pipes of a VESDA smoke detection system are installed at the air intake of the air conditioner inside the computer room. Is this a good practice from an early smoke detection point of view?
    Choose the Choices:


    Question No 3
    You need to determine the strategy for the cooling audit. All the servers are based on a front - to - rear (F - R) airflow design. Which location for the temperature/humidity measurement should you recommend for the audit?
    Choose the Choices:


    Question No 4
    You are installing new copper cabling. What is the advantage or disadvantage of choosing pre - terminated category 6 or 6A cabling?
    Choose the Choices:


    Question No 5
    When are the wet bulb and dry bulb temperatures identical?
    Choose the Choices:



    1. Page: 1/12
      Total 60 Questions